The concrete base for the wind generator project has been poured. This project employs green technology and recycling. A best case scenario.
Recycling employed for the concrete base construction:
Old plastic bargage can used for concrete form.
Metal plate from an old wheelbarrow was used to anchor bolts inside the concrete.
3 galvanized poles were purchased from DH Griffin, a salvage, recycling and demolition company based in Greensboro, NC.
Already owned rebar and bolts were used.